Very little accomplished today. Going to be easier to put the anti rock bars on and weld to the axle with the tub off. Hope to get some weekday stuff done this week.
Bedliner sprayed. Will end up taking 1-1/2 kits. Got some touch ups to make when I flip it over. Got some light spots on the sides I was laying down doing.
I used the Raptor Liner. I've used it several times and like how it lays down. It's a pretty hard product so it works well for this application. Not sure that it would be my go-to for an actual bedliner though...
Thanks Brooks. Prepping the bottom was a bit of a chore but I am hoping it makes keeping it clean easier. Well painted surfaces tend to clean much easier and I am hoping to keep this one in good shape.
I used Al's on mine and I have been a little disappointed in the stick of it. It laid down really nice, but it has peeled up in my floors from my feet. Very frustrating after taking so much time to do it.
Got the tub on. Picked up driveshafts and put the front in. Started putting the accessories on the engine. Gonna have a paint party in the morning and will be doing some major assembly on Sunday.
They did. All Spicer components. I know some people have had issues with them recently but if you buy the good stuff up front they put together a quality product.
Got the booster mounted and all of the brake lines in place and bolted down yesterday. Mocked up the 8274. Cant decide if I want to weld the mount directly to the bumper/frame or make it removable... Going to try to put in a couple hours every night this week and see if I can have it looking more like a Jeep before the holiday weekend starts.
Got the booster mounted and all of the brake lines in place and bolted down yesterday. Mocked up the 8274. Cant decide if I want to weld the mount directly to the bumper/frame or make it removable... Going to try to put in a couple hours every night this week and see if I can have it looking more like a Jeep before the holiday weekend starts.
Well a 95* SC afternoon and about 2-1/2 hard hours on this winch plate cutting and welding. We have a removable mount. Couldn’t bring myself to have it welded directly on.... Lost one bolt hole to the raised steering box but wi have two in the center to make up for it.
Got the steering reservoir/filter mount made and mounted on the shock tower, lines plumbed/routed, gas tank in place and holes drilled for the fuel lines.
Gonna hit the lake for the weekend and hop back on this project Sunday.
Hope to do fuel lines and trans cooler lines Sunday. Then will be time to start fitting the engine harness back on. Still have to loom up the Jeep harness. If I remember correct I had split off for auxiliary switch power as well as ignition switch power for the fan and fuel pump. Have to wire up all the gauges and accessories.
Feels like we’re so close.
Fuel lines are made, pump actually mounted this time..., and trans cooler mounted to radiator along with lines made. Trying to decide how I’d like to hold the lines to the frame. Zip ties just don’t seem right...
Fuel lines are made, pump actually mounted this time..., and trans cooler mounted to radiator along with lines made. Trying to decide how I’d like to hold the lines to the frame. Zip ties just don’t seem right...