I drove thru trail 1 yesterday, they have really ****ed it up. As your traveling from n.c to tenn. they have logged the mountain below the trail & the switchbacks have been made twice as large just to get heavy equipment down there to build another larger switchback down at the creek. Basicly the whole side of the mountain is bulldozed and washing into the creek every time it rains. below are some pics we took while there
n.c paystation
logging @trail 4
switchback mess
below they bulldozed logging debri off the side of the trail ,then dumped gravel to make the road wider
n.c paystation

logging @trail 4

switchback mess




below they bulldozed logging debri off the side of the trail ,then dumped gravel to make the road wider

